Tallahassee Metal Roof Co. logo

Metal roofing in Tallahassee, FL

Metal Roof Installation in Tallahassee, FL

  • Typical cost: about $5 to $16 per sq ft installed nationally, so $7,500 to $40,000 on a 1,500 to 2,500 sq ft roof (HomeGuide)
  • Time on the roof: two to five days for most installs, more if the deck needs work (HomeGuide)
  • Labor alone: $4 to $8 per sq ft of that price (HomeGuide)
  • Lowest slope allowed: 1/4 in 12 for standing seam, 3 in 12 for lapped panels without sealant (Florida Building Code)

Tallahassee Metal Roof Co. puts you in touch with a metal roofing installer who works around Tallahassee on new homes, additions, re-roofs and low-slope sections. The quote should name the panel (standing seam, 5V crimp or R-panel), the gauge, the underlayment method and the Florida Product Approval number.

Two-story red brick home with a new charcoal gray standing seam metal roof under tall pines and a moss-draped live oak

Metal Roof Installation Jobs Around Tallahassee

A metal install here is usually one of three jobs: a roof on new framing, new metal on an existing house, or a near-flat section on a porch or addition. Underlayment, trim and venting come with all three.

Fresh plywood roof deck on a new frame addition beside a brick house, partly covered in gray synthetic underlayment

New-Construction and Addition Metal Roofs

New framing means no tear-off. The work that matters is where the new roof meets the old one. On an addition to a shingled house, ask how the metal and shingles meet and what metal the flashing is.

  • Deck: solid or closely fitted sheathing, unless the panel is designed for spaced supports (FBC 1507.4.1)
  • Flashing: required where a roof meets a wall, wherever slope or direction changes, and around roof openings (FBC R903.2.1)
  • Steel flashing minimum: 26 gauge (0.0179 in.), G90 galvanized or AZ50 Galvalume (FBC Table R903.2.1)
Crew laying the first standing seam panels over new underlayment on a single-story brick ranch house under pine trees

Re-Roof Installs on Existing Homes

When an existing roof goes to metal, the residential code bars putting rusted, damaged or worn vent flashing, metal edging, drain outlets, collars or counterflashing back on. Flashing has to be rebuilt to the manufacturer's instructions. A quote that reuses the old pipe flashings to save an hour is a quote to question. Tear-off and deck re-nailing are covered on the metal roof replacement page.

  • Install time: two to five days on most roofs (HomeGuide)
  • Fasteners: galvanized for steel roofs, stainless for any metal, aluminum-zinc coated for Galvalume, unless the manufacturer says otherwise (FBC R905.10.4)
Bronze mechanically seamed standing seam roof on a nearly flat rear addition of a frame house

Low-Slope Metal Installs

The code lets standing seam go down to 1/4 in 12, but the product approval has the final word. One manufacturer won't recommend snap-lock panels at or below 3 in 12 and points low roofs to double-lock mechanical seams, with in-seam sealant below 2 in 12. Screw-down panels need lap sealant under 3 in 12 and can't go below 1/2 in 12. Inside city limits, a slope under 4 in 12 adds a review step to the permit (see replacement). For porch roofs, see metal porch and patio roofs.

  • Standing seam floor: 1/4 in 12 (FBC R905.10.2)
  • Lapped panels: 3 in 12 without sealant, 1/2 in 12 with it (FBC R905.10.2)
Gray synthetic underlayment cap-nailed in rows across a roof deck with metal drip edge along the eave

Underlayment, Flashing and Trim Package

Underlayment keeps water out if a panel lifts in a storm, so read this part of the quote closely. The two-layer method has exact nailing rules in the residential code. The trim package (drip edge, rake, valley, ridge and wall flashing) is where most of the labor goes. HomeGuide traces most metal roof leaks to installation at seams, fasteners and roof penetrations, which is this part of the job.

  • Cap nails, two-layer method: 12 in. apart in the field, 6 in. at laps, caps at least 1 in. across (FBC R905.1.1.1)
  • Laps, two-layer method: end laps 6 in., staggered 6 ft (FBC R905.1.1.1)

Ridge Vents and Attic Airflow

A metal roof over a hot attic still passes heat down. Florida Solar Energy Center research puts roof and attic heat gain at about 20% of a house's cooling load. The residential code sets net vent area at 1/150 of the vented attic area. That drops to 1/300 when 40% to 50% of it sits within 3 feet of the ridge and the rest sits in the lower third of the attic. Ask whether the ridge vent and soffit vents are in the price.

Roofer seen from behind measuring a worn asphalt shingle roof before a metal roof estimate

Why Tallahassee homeowners call Tallahassee Metal Roof Co.

  • Free referral, no charge to homeowners
  • Your request reaches a single metal roofing contractor, not a list
  • Ask for panel, gauge and Product Approval number in writing
  • Free, no-obligation estimate from the roofer

Get a free metal roofing estimate

Free for homeowners. One local contractor contacts you.

Metal Roof Installation Wind Rules for Leon County

Leon County isn't in Florida's High-Velocity Hurricane Zone (only Broward and Miami-Dade are), so metal roofs here follow the statewide code sections. The wind numbers still matter.

Design wind speed. The Florida Building Code's map for Risk Category II buildings, which covers most houses, puts Leon County between the 115 mph and 120 mph ultimate design wind speed lines. Leon adopted the preliminary map as it was drawn. For an exact figure at one address, the code points to the ASCE 7 Hazard Tool. Both numbers sit below the 140 mph threshold for Florida's wind-borne debris region.

Panel testing. FBC 1504.3.2 requires metal panel roofs, screw-down or standing seam, to be tested to UL 580, ASTM E1592 or TAS 125. UL 580 classes are 30, 60 and 90, which mean the panel held 45, 75 and 105 psf. UL 1897 pulls on the panel's connection to the deck until something gives, so it reports an actual capacity.

Product approval. The code requires panels to be made to the manufacturer's Florida product approval and its limits of use, under a quality program audited by a third party the Florida Building Commission approves. The approval number goes on the City's roofing application and on the County's re-roof affidavit. Check that the approval covers your deck type and the fastener spacing the quote describes.

Code edition. These are 2023 Florida Building Code (8th edition) rules. The 9th edition takes effect December 31, 2026.

See standing seam metal roofs for gauge and finish choices.

Metal Roof Installation Steps, Permit to Final

  1. 1

    Permit and Product Approval

    A roofing permit is needed for work over 100 square feet, from the City or Leon County depending on the address. The product approval number goes on the application.

  2. 2

    Deck Check and Dry-In

    The old roof comes off (or the new deck goes on), loose sheathing gets nailed, and the underlayment goes down. Both offices inspect the deck nailing and the secondary water barrier before panels cover them.

  3. 3

    Panels, Clips and Fasteners

    Panels are cut to length and fastened in the pattern the approval sets. On runs longer than 25 feet, one manufacturer calls for clips that let the panel move as it heats and cools.

  4. 4

    Trim, Flashing and Vents

    Valleys, walls, chimneys, pipe boots, ridge cap and ridge vent go on last. This is the slowest part of the job on a cut-up roof.

  5. 5

    Final Inspection

    Leon County's final needs the notarized re-roof affidavit, the product approval's installation instructions and printed photos of each roof plane on site.

Metal Roof Installation Deposits and Payment in Florida

Florida law sets a clock on deposits for residential work. Under Fla. Stat. 489.126, a contractor who takes more than 10% of the contract price has 30 days from that payment to apply for the permit. Work then has to start within 90 days after the permit is issued, unless there's just cause or the owner agrees in writing to an extension. HomeGuide's advice is to never pay in full before the work starts. One simple approach is to tie later payments to passed inspections.

Frequently asked questions

How many days does a metal roof installation take in Tallahassee?
HomeGuide puts most metal roof installs at two to five days, longer when rotten decking turns up. The permit comes first. The City lists about five workdays to review minor residential building permits but publishes no roofing-only turnaround. In unincorporated Leon County, single-trade permits that qualify for the online portal are issued immediately.
How much does metal roof installation cost per square foot?
HomeGuide gives $5 to $16 per square foot installed, with labor making up $4 to $8 of that. Fixr puts labor at $3 to $12. Screw-down 5V and R-panel sit at the low end and standing seam at the high end. Pitch, valleys and chimneys move a quote more than floor area does.
Is it hard to install a metal roof?
The panels are the easy part. Trim, flashing and the attachment pattern take the skill. Mechanically seamed standing seam needs a hand or robotic seaming tool, and every system has to follow its Florida product approval, which sets the deck, fasteners and spacing. HomeGuide notes that most metal roof leaks trace back to installation, at seams, fasteners and penetrations.
Can I install a metal roof myself in Leon County?
In unincorporated Leon County, a homeowner who lives in the house can pull an owner-builder permit. You must sign in person, you become the responsible party of record, you must supervise the work on site, and you can't hire an unlicensed person to do it. If an unlicensed worker gets hurt, the liability can fall on you.
Can metal roofing be installed over plywood?
Yes. The Florida Building Code wants metal panels on a solid or closely fitted deck unless the panel is designed for spaced supports, and plywood sheathing is the usual deck. The plywood then gets one of the three underlayment methods the code lists for metal before any panel goes down.
What are the most common metal roof installation mistakes?
Reusing rusted vent flashing or edge metal, which the residential code bars on a re-roof. Running lapped panels below 3 in 12 without lap sealant. Using fasteners that don't match the panel metal. Running nail-strip panels past about 25 feet, the length limit one manufacturer gives for clipless panels. And installing a system that doesn't match its product approval.

Ready to get started in Tallahassee?

Tell us about the job and a local metal roofing contractor will get back to you with a free estimate.

Get a free metal roofing estimate

Free for homeowners. One local contractor contacts you.